GUIDANCE FOR Property Owners & Developers

 

Internal Drainage Boards and Development Control

The Black Sluice Internal Drainage Board (the Board) is an independent authority

constituted under the 1930 Land Drainage Act, with duties “to exercise a general

supervision over all matters relating to the drainage of land within its district”.

The Board acts as a non-statutory consultee to Local Planning Authorities, but

importantly the Board has its own statutory powers with respect to drainage which

also determines how and if a development may proceed. The Board’s current powers

derive from the Land Drainage Act 1991.

 

How the Board Appraises Properties or Developments

The following factors are considered by the Board when appraising proposed

properties or developments:

  1. Rainfall Run-off and Development Contributions
  2. Disposal of Foul or Dirty Water
  3. Discharge Outfalls
  4. Access to Watercourses
  5. Filling in or Culverting Watercourses
  6. Property Floor Levels
  7. Site Ground Level
  8. Environment and Biodiversity

Detailed guidance for each of these factors follows - emboldened sentences indicate

the Board has statutory powers.

Application forms and other leaflets referred to may be obtained from the Board’s

offices (address above), or the Board’s website www.blacksluiceidb.gov.uk.

 

Section 1 - Rainfall Run-off and Development Contributions

The Board’s consent is required to increase the rate of rainfall run-off from a

property or development.

Where possible sustainable methods of disposal should be used which do not

adversely affect existing surface water management, nor adversely expose people or

property to an increased risk of flooding. In most instances sustainable disposal will

best be achieved by dealing with rainfall run-off at or as near as possible to source

using Sustainable Drainage Systems (SuDS). For example:

  1. Rainwater recycling
  2. Soakaways, Infiltration areas and Swales
  3. Filter drains and porous pavements
  4. Attenuation or balancing ponds

NB: Soakaways and infiltration systems should be designed and proved with a

percolation test in accordance with BRE Digest 365 or other approved code.

 

A Development Contribution shall be payable to the Board for any discharge

from the site above the green field rate.

The development contributions (1/4/2011-31/3/2012) for un-regulated flows are:

  1. £5.80 +VAT per impervious square metre of Development (£58,000/ha) OR
  2. £850.00 +VAT for a Single Property

NB: No charge is made for the use of soakaways (see above).

If the flow is regulated or attenuated then the above charge is proportioned in

accordance with the flowing flow rates:

 

Green field rate: 1.4 litres per second per hectare (zero charge)

Impervious area rate: 100 litres per second per hectare (full charge)

Where the discharge is via a third party system such as a private watercourse or

Anglian Water surface water sewer then their permission is also required.

The one-off Development Contribution covers the cost to the Board of improving the

general drainage infrastructure to accommodate the increased flows. However, the

Board cannot guarantee to accept any water if it is unfeasible to increase the

capacity of the existing system. Where localised off-site works are required to a

Board or private watercourse, then the improvement must be approved by the Board

and paid for by the property owner/developer in addition to the development

contribution. The Board may be prepared to carry out the work using its powers

under the Land Drainage Act.

 

Section 2 - Disposal of Foul or Dirty Water

The Board’s consent is required to discharge any water into any surface water

system.

Foul or dirty water, including water from vehicle wash downs, shall not be discharged

directly to a surface water system. Where a separate foul water system (i.e. Anglian

Water) is not provided, then the water shall be treated before disposal.

If a property owner/developer wishes to make a discharge into any watercourse

within the Board’s district, then the consent of both the Board and the Environment

Agency (the EA) is required as follows:

a) From the Board - to allow an increase in flow into the drainage system*

b) From the EA - who will agree the quality of the water to be discharged

* The Board does not require an application for discharges of less than 1m3/day into

a watercourse not maintained by the Board.

Septic tanks shall not discharge directly to a watercourse but to a soakaway system.

If septic tanks are not approved by the EA, then a package treatment unit will be

required; the Board recommends that, unless there is a 600mm freeboard from the

unit outlet invert to normal water level, the unit should have a pumped discharge.

 

Section 3 - Discharge Outfalls

The Board’s consent is required before any structure is placed in a Board

watercourse.

All outfalls shall have a suitable headwall to protect the banks from erosion. No part

of the headwall unit shall protrude beyond the profile of the bank in order that flails

and weed cutting machinery is not obstructed. Suitable scour protection shall be

placed below and/or in front of the headwall if necessary. Details of a suitable

headwall can be obtained from the Board. Alternatively, the structure shown in

“Sewers for Adoption, 6th Edition, Figure 2.1” will be acceptable.

Outfall connections into piped systems shall preferably be to a manhole, although the

use of a proprietary saddle connector may be permitted.

 

Section 4 - Access to Watercourses and Byelaws

No obstructions shall be placed within 9m of the edge of a Board Watercourse.

The Board’s Byelaw states:

“No person, without the previous consent of the Board, shall erect any building or

structure, whether temporary or permanent, or plant any tree, shrub, willow or similar

growth within 9 metres of the landward toe of the bank where there is an

embankment or wall, or within 9 metres of the top of the batter where there is no

embankment or wall, or where the watercourse is enclosed within 9 metres of the

enclosing structure”

The Board has a separate policy leaflet regarding this byelaw.

Access to and maintenance of all other watercourses or piped systems (not vested

with any authority) is the responsibility of the riparian owners i.e. the land owners on

either bank.

Developers should take into account the future maintenance of riparian or private

watercourses and piped systems when designing the site layout; access may be

required for weed cutting excavators or for jetting equipment for pipe systems.

Developers shall inform purchasers of the presence of a Board Watercourse and/or

their responsibilities relating to a riparian watercourse.

 

Section 5 - Filling in or Culverting Watercourses

The Board’s consent is required before any Board Watercourse or

riparian/private watercourse is culverted, filled in, or otherwise obstructed.

The Board considers that it is beneficial for watercourses to remain open wherever

possible for both drainage and environmental purposes. Culverting or filling destroys

wildlife habitats, damages a natural amenity and interrupts the continuity of the linear

habitat of a watercourse. It can also remove functional flood plain storage and

therefore increase the risk of flooding.

Access culverts will normally be consented, but in other instances consent will only

be given if a benefit can be shown and/or mitigating environmental works and flood

storage can be provided elsewhere.

The Board has a policy leaflet regarding the culverting of Board Watercourses.

 

Section 6 - Property Floor Levels

The Board may make recommendations to the Planning Authority in respect of good

practice in relation to flood risk and land drainage.

Planning Policy Statement No 25 (PPS25) states that: site layout and surface water

drainage systems should cope with events that exceed the design capacity of the

system so that water can be safely stored or conveyed from the site without adverse

impact.

Sewers for Adoption specifies that: site rainfall runoff systems should be designed

not to flood any part of the site in a 1:30 year (3.3%) event.

The Board recommends that no property should flood in a 1:100 year (1%) site

specific event, therefore flood storage above a 1:30 year event may need to be

provided in areas such as roads, parking, open space etc. In addition, the Board may

recommend a minimum floor level based on recorded flooding or catchment

modelling. Other authorities or insurance companies may require a higher standard

of protection or floor level.

 

Section 7 - Site Ground Levels

The Board recommends that the ground level of the site should not be raised above

the level of neighbouring land unless it can be shown that it will not:

In general if ground levels are raised above surrounding land then interceptor

infiltration drains (French Drains) will need to be installed around the site boundary.

The future responsibility (including maintenance) of such drains shall be private.

 

Section 8 - Environment and Biodiversity

It is the Board’s statutory duty, when considering whether to issue consent, to

take into account any likely adverse effect on the environment.

The Board is a signatory to the Lincolnshire Biodiversity Action Plan (BAP) and

welcomes opportunities to work in partnership with developers to carry out

environmental improvements on Board Watercourses.